PROJECT DESCRIPTION
Bay Machine and Fabrication was tasked with reporting to a jobsite to troubleshoot an anchor winch. The winch was broken free of its foundations, hoisted off the vessel with a 120 ton crane, and brought to the shop for teardown and cleanup, eventually being returned to the vessel
PROJECT DETAILS
Finish: None
Primary Materials: Steel
Crafts Involved: Inside and Outside Machining